PAITON – 3 COAL FIRED STEAM POWER PLANT

Scope of Work :

Installation of : U/G Piping (CWP), Steel Structure for T/G Building, Steel Structure for Boiler Boilers, Boiler Auxiliary, Turbine Generator, BOP & Piping, ESP / FGD, Ducting, Water Separator, Coal Bunker, Hydro test, Painting, Insulation, Lining, Assistance for pre-commissioning Test & Commissioning


Project Details

  • Owner: PT. Paiton Energy
  • Client: MHI / Taihei Dengyo Kaisya, LTD
  • Capacity: 1x815 MW - Supercritical Boiler
  • Location: Paiton, East Java

PALABUHAN RATU 3 COAL FIRED STEAM POWER PLANT

Scope of Work :

Total Plant Construction of Boiler , Turbine , Generator , BOP Plant and Substation 150 KV
Civil, Mechanical, Electrical, Instrumentation and Control System


Project Details

  • Owner: PT. PLN Persero
  • Client: Consortium Shanghai Electric China andPT Maxima Infrastructure
  • Capacity: 3 X 350 MW
  • Location: Palabuhan Ratu, West Java

CILEGON COMBINES CYCLE POWER PLANT

Scope of Work :

Total Civil Work, Mechanical Equipment Installation, Piping Work, Electrical & Instrumentation, Substation, 150 KV Transmission Line


Project Details

  • Owner: PT. PLN Persero
  • Client: Consortium with Mitsubishi Corporation
  • Capacity: 1x 740 MW
  • Location: Cilegon, Banten